Shrewsbury: Important Safety Tips for Lake Quinsigamond

Posted by on Jan 5th, 2013 and filed under Local News. You can follow any responses to this entry through the RSS 2.0. Both comments and pings are currently closed.

Manitoba Churchill two snowmobilers on frozen lake 676433 300x200 Shrewsbury: Important Safety Tips for Lake Quinsigamond Shrewsbury MassachusettsSHREWSBURY, Massachusetts - The construction operations at the Route 9 Bridge over Lake Quinsigamond are scheduled to continue throughout the upcoming winter months. The winter construction will result in changes from normal winter conditions on the lake, and the public should be aware of these conditions. The majority of the bridge work will be performed from the lake using heavy equipment on barges. A secondary off-site ‘staging area’ has been established approximately 1000 yards south of the bridge from which workers, equipment and materials will be transported back and forth to the bridge site on a daily basis.

In anticipation of a typical winter with a frozen lake surface, the project team will be maintaining an OPEN WATER NAVIGATION PASSAGE between the two sites. This area must be avoided by all snowmobilers, X- country skiers, skaters, ice fishermen, or anyone else on the ice.

For public safety: warning signs, floats and lights will be anchored to the lake bottom to mark the boundaries of the open water. An aerial view of the open water zone and warning system is attached. Please take note of the following:

 The limits of this area extend from Route 9 approximately 1000 yards south. As a point of reference this is between the Shrewsbury Police boat house and the Italian-American Civic Club in Worcester.

 A minimum 100-foot wide channel will be maintained through the ice for the full length.  Anchored at the north and south ends of this zone will be flashing message boards and reflective signs

on steel floats. The message will read “DANGER – OPEN WATER”  Along either side of the channel, floating drums with lights and reflectors will alternate with additional

signs on floats.

 The elements of this marking system will be installed so that they remain in place though frozen or thawed lake conditions. The markers will be removed at spring thaw.

For more information on the bridge construction, or to be added to the project email list, please visit the project website at: www.mass.gov/massdot/kenburnsbridge or contact Stephanie Boundy, Public Outreach Coordinator for MassDOT’s Accelerated Bridge Program at (857) 368-8904 or stephanie.boundy@state.ma.us.

Did you like this article? Share it with your friends by clicking one of the icons below...
Keamy Eye Center. Click here for more info

Salon Sogno. Click here for more info


Here are a few great Shrewsbury Real Estate listings
Courtesy of Steve Levine, RE/MAX Professionals
Shrewsbury's Top Agent since 1992
(508) 845-HOME <4663>
steve@shrewsbury.net

Comments are closed

Advertisement
“Post



“b.good


Heald & Chiampa


Eagle Sealcoating

Steve Levine - Shrewsbury's Top Agent

Stellar Images

Siagel

Find the value of your home in today's market

Shrewsbury Health and Raquet Club

Fiore's - Auto service and sales

Shrewsbury Green Dumpters!

Photo Gallery

Shrewsbury's #1 Real Estate Professional. Click here for more info
Log in
/ Shrewsbury Lantern copyright by Steve Levine
. by . . by . Shrewsbury Home Listings by Steve Levine Worcester County Home Listings Steve Levine Shrewsbury Lantern copyright by Steve Levine