New Bridge Opens in Shrewsbury at last

Posted by on Jan 14th, 2014 and filed under Local News. You can follow any responses to this entry through the RSS 2.0. Both comments and pings are currently closed.

IMG950410 300x225 New Bridge Opens in Shrewsbury at last Shrewsbury MassachusettsSHREWSBURY, Massachusetts – Beginning this afternoon, traffic has been shifted from the existing Kenneth F. Burns Memorial Bridge (Route 9 over Lake Quinsigamond) and onto the first half of the new replacement bridge. Many Shrewsbury residents delighted in making that historic trip over what is sure to become a Massachusetts landmark structure.

The relocation of traffic will be accomplished in two stages. The first stage will shift only the two eastbound lanes onto the new bridge while westbound traffic will remain on the old bridge. Two days will then be needed to modify the westbound lanes, preparing for the remaining traffic shift on the third day. Once all traffic has been moved to the new bridge, traffic conditions will be as they currently are with two eastbound and two westbound lanes maintained during all peak hours. Throughout the traffic shift and once it has been completed, access to all abutting properties and businesses will be maintained.

After the traffic shift has been completed, pedestrians will also be relocated onto the new sidewalk on the south side of the new structure. Pedestrians are reminded that once the old bridge closes, it will become part of the project’s work zone and will not offer a safe walkway between Worcester and Shrewsbury.

Demolition of the old Kenneth F. Burns Bridge will commence after the successful shifting of traffic to the new structure. Demolition is currently anticipated to last roughly four months at which time construction on the other half of the new bridge will begin in the footprint of the original structure. When complete, the new Kenneth F. Burns Bridge will include three lanes in each direction, matching the abutting sections of Route 9.

The Kenneth F. Burns Bridge is being replaced through the Commonwealth’s historic, $3 billion Accelerated Bridge Program (ABP). For more information about this job, please visit www.mass.gov/massdot/kenburnsbridge or contact Stephanie Boundy at stephanie.boundy@state.ma.us or (857) 368-8904.

Did you like this article? Share it with your friends by clicking one of the icons below...
Keamy Eye Center. Click here for more info

Salon Sogno. Click here for more info


Here are a few great Shrewsbury Real Estate listings
Courtesy of Steve Levine, RE/MAX Professionals
Shrewsbury's Top Agent since 1992
(508) 845-HOME <4663>
steve@shrewsbury.net

1 Response for “New Bridge Opens in Shrewsbury at last”

  1. krobkoe says:

    Historic trip! We have come a long way in just a few hundred years. This was a floating bridge that did not hold at one time, then a trolly line crossing too. Just too bad that many of the old “Lake Clubs” have perished over time.

Comments are closed

Advertisement
“Post



“Post



“b.good


Heald & Chiampa


Eagle Sealcoating

Steve Levine - Shrewsbury's Top Agent

Stellar Images

Siagel

Find the value of your home in today's market

Shrewsbury Health and Raquet Club

Fiore's - Auto service and sales

Shrewsbury Green Dumpters!

Photo Gallery

Shrewsbury's #1 Real Estate Professional. Click here for more info
Log in
/ Shrewsbury Lantern copyright by Steve Levine
. by . . by . Shrewsbury Home Listings by Steve Levine Worcester County Home Listings Steve Levine Shrewsbury Lantern copyright by Steve Levine